106 Nantou County Water Pollution Source Scientific Inspection Control and River Watch Operation Plan

Absrtact
1. In-depth review of water pollution causes: The number of contracts was 150. During the implementation of the project, 217 valid inspections have been completed with a completion rate of 100.0%. The inspection results were as follows: (1) There were 2 wastewater exceeding Approved volume, 1 meter malfunction, 1 unlicensed operation. (2) There is not a normal power on boot 1, 1 unauthorized operation, a mining gravity flow need not be set. (3) There is a dosing amount is not normal boot dosing. (4) Sludge quantity exceeded 2 by the approved amount, 7 no sludge generated unreasonable, 5 temporarily stored in the sludge temporary pool, not cleared this year can not be checked. 2. Water sample inspection: The number of contracts was 65. During the implementation of the project, a total of 98 sampling and analysis sessions were conducted in this project. The sample households included 19 livestock husbandry and 79 other times Those who failed the sampling were all qualified or counseled to improve the operation mode of relevant waste water treatment facilities after they were reviewed. The implementation rate reached 100.0%. 3.Investigation and Seizure of Dark Tube: During the implementation of the project, a total of 7 cases of hidden tube / unknown pipeline were seized, and all were removed or sealed up after confirmation by the project staff. According to the water quality of the connected pipeline and discharge of water The amount of reduction of water discharged into the receiving water was 147.0 kg / day, the reduction of BOD to the receiving water volume was 59.1 kg / day, and the reduction of SS discharged into the receiving water body was 44.65 kg / day. 4.According to the 106 annual industrial zone water pollution prevention and control management program to check operations: for the industrial zone "combined sewage discharge water" or "sunny day when the discharge of major runoff waste water discharge", in which RD37 Industrial Zone rain ditch discharge check Repeatedly failed to meet the discharge standards, the Nangang Industrial Zone, contact the sewage plant, take the initiative to check the upstream sources of pollution, has been verified upstream of a cause of management has not set up wastewater treatment facilities, the waste water into the ditch, has been counseling set enough wastewater treatment Facilities, and apply for permission to apply, has now been included in the Nangang Industrial Zone Sewage Treatment Plant; in charge of the industrial zone of the management of the discharge of more than the amount approved, of which six check site and permission to apply for the correct content, a plant name Has been changed, the two on-site water usage exceeds the allowable approved amount, the industry has reduced the amount of water and change permits to improve the application, two licenses expired, has been informed to re-apply for permission; the other three water permits exceed the approved amount has been Inform the industry as soon as possible licensing documents for changes. 5. Review and Documentation of Permits for Prevention and Control of Water Pollution: During the implementation of this project, a total of 124 applications for filing were filed by the industry, of which 55 were for the 105th consecutive year Nantou County Basin Pollution Total Management and Point Source Pollution Reduction Project Review , Of which water pollution prevention and control measures for the most part of the project, the discharge of surface water permits followed, followed by simple emission permits; water pollution sources to handle all the applications for permission to approve the case, a total of 126 approved cases, there are 45 amendments. 6.The implementation of waste water (waste) water treatment facilities functional assessment operations: The project during the implementation period, August 29, 106 implementation of the three can Food Co., Ltd., September 21, 106 implementation of the state of Shuangbanggufen Co., Ltd. Plant, August 29, 106 implementation Quanhong Food Enterprise Co., Ltd., September 21, 106 implementation Qizuo Industrial Co., Ltd. 4 sub-institutions waste (sewage) water treatment facilities function evaluation operation. 7. Ensuring Water Quality and Quantity Automatic Monitoring and Recording Video Surveillance System Stable Operation: The project is monitored daily at 8:30 am. The plan is implemented on March 17, 106, April 16, 106, 106 April 22, 106 May 12, 106 June 26, 106 August 08, 106 August 22, 106 August 24, 106 September 14, 106 September 15, September 26, 106, September 29, 106, October 11, 106, October 26, 106, November 10, 106, November 26, 106, 106 On the 12th of the month, the reason for the temperature exceeded the limit, the website went abnormal, SS, COD, conductivity, temperature system maintenance, website data can not be seen, pH over the limit value, improve the treatment have returned to normal. 8.The implementation of the project to help confirm the second phase of the business collection of water and sewage charges list, confirmed to be required to pay the number of water and sewage charges, to be declared in the first half of 106 water and sewage charges, the number of households in charge of a total of 179, In the first half of 106s, it was estimated that the trial fee of water quality and water amount to be used in the first half of 106 could be collected totaling RMB 2,730,946. This year there will be additional water and sewage charges. Compared with the second half of 105, it will be levied at RMB 1,362,370, with an increase of about 1 times of revenue. 9.Promote the Use of Animal Waste and Residue Biogas Digester as Farming Land Fertilizer Use Policy and Strengthen Auditing Control of Livestock Ranch: The project has screened four candidates for counseling and completed the on-site confirmation of irrigating farmland and collecting the relevant land area and land No., We have assisted the animal husbandry in the county to deliver 4 biogas slurry for use as a fertilizer program for agricultural land. As indicated in sections 4-7, a total of 555 cattle and 3,500 pigs produce biogas residue The biogas slurry can be reused. The area of irrigated farmland is 28.58 hectares. Pennsular plants, oranges, fruit trees, tea leaves, ginger, betel nut, red dragon fruit and mahogany are planted in the irrigated farmland. The estimated annual BOD is 85,518.8 kg / Year, SS reduction of 164,971.1 kg / year; assessment of biogas utilization carbon rights accreditation, confirmation and conversion of anaerobic fermentation within the jurisdiction of the jurisdiction to 42 pig farms, raising a total of 88,341 pigs, cattle have 4 At home, a total of 723 cattle and 1 sheep farm have been raised. A total of 600 sheep are raised, which can produce 14,358.4 kWh of electricity per day and an annual electricity supply of about 17.7 million yuan, which can reduce the production cost of livestock farms. 10.Dealing with the Propaganda Briefing on the Reduction of Water Pollution Sources and the Revision of Laws and Regulations: The project is expected to handle three announcements on the declaration of relevant ordinances in the sub-water pollution prevention and control laws according to the contract. During the project, three seminars will be held on the declaration of water pollution sources, On March 26, 2006, November 13, 106 and November 14, 2006, respectively, they conducted three briefing sessions at the Women and Children Hall of Nantou County and the Puli Town Office. The contents of the briefing include the "Water Pollution Prevention and Control Law Focus, Water and Sewage Charge Collection and Payment Instructions", "Licensing and Definitive Deficiencies", "EPA's Draft Amendments to the Legislation" and " Residue as fertilizer use policy to promote rural areas, "the four themes. 11.To promote water environment volunteer patrol system: This year there are 2 new teams, eliminating 1 team, a total of 14 teams of water environmental patrol team, a total of 367 members, the project during the implementation, through field visits Check each Patrol team team to understand the characteristics of the patrol team, the operation of the situation, the difficulties encountered and the need for assistance. A total of 60 net river activities (totaling 778 participants) were conducted. With reference to the screening standards of the EPD's excellent patrol teams, the key points of performance appraisal for water environment patrol work were formulated. 12 propaganda activities, results review and environmental education activities were conducted , A total of 16 water quality monitoring activities, the escort team informed the Environmental Protection Agency river river mess mess point 38 cases, has been cleared by the patrol team to complete. 12. To track the effectiveness of operation of the facilities for improving water quality at the upper and lower reaches of Ying-Ying Bridge, Puli Town. Follow-up Evaluation: During the implementation of this project, a total of 15 operations and maintenance of Yuying Bridge Demonstration Area have been carried out. The water quality improvement facilities (old works) , It was found that there was a number of facilities damaged in 2004 due to Typhoon Suderean. There were already 3 long-term floodplains on the sides (front, middle and rear sections), cracks, and considerable leakage of water. After the repair and 106 annual operation and maintenance, has been able to work normally; Yuk Ying Bridge old project COD treatment efficiency of 48.8%, BOD treatment efficiency of 68.0%, SS treatment efficiency of 61.2%, ammonia treatment efficiency of 53.9%, the new project COD treatment efficiency Up to 60.2%, BOD treatment efficiency up to 64.8%, SS treatment efficiency up to 61.3% and ammonia nitrogen treatment efficiency up to 40.6%. Overall, the facility has the original design functionality. 13. Survey and Statistics on Sewage Quantity of Sewage Treatment Facilities: During the implementation period, this project collects regularly the reported results of sewer sewage from sewage treatment facilities in Nantou County. Based on the amount of sewerage, the project takes 255.91 tons / year of Puli Town Nandou City, 216.12 tons / year, followed by the country surnamed Township, Chushan Town, Caotun Town and Jiji Town. Because there is no place for water and fertilizer treatment in Nantou County, it is suggested to choose Nangang Industrial District WWTP or Nantou City Water Resource Center Sewage plant to set water and fertilizer inputs.
Keyword
Depth inspection, permit review and documentation, functional assessment operationsntation, biogas residue as farmland fertilizer use, water environment volunteer inspection system
Open
top